ManagePrintManagePrint
Production board & scheduler

A print shop production board that runs on your stages.

Every garment and every print, in the stage it has actually reached — because the floor logged it, not because somebody remembered to change a dropdown.

3 jobs · 11 line items· 1 filter active

Pending
In Prep
Awaiting Approval
Approved
In Production
Completed
INV-1042In Production2026-08-18

Fall Spirit Pack

Northgate High School

1/7
PND
1
Next Level 6210 Tee
Heather · 18
0/2
PREP
1
Yupoong 6606 Cap
Forest · 24
Dee W.0/1
APPR
1
Sport-Tek Coach Jacket
Black · 12
0/1
OK
1
Independent SS4500 Hoodie
Forest · 36
Dee W.0/2
PROD
2
Gildan 5000 Tee
Forest · 96
Marisol R.1/2
Gildan 5000 Tee
Sand · 48
Marisol R.1/2
DONE
1
Liberty Bag 8863 Tote
Natural · 60
T.K.1/1
INV-1039In Prep2026-08-17

Taproom Staff Tees

Riverside Brewing Co.

0/2
INV-1044Awaiting Approval2026-08-20

Duty Hoodies — Station 3

Cedar Park Fire Dept.

0/2

The board, with one job opened. Seven line items on the spirit pack, sitting in six different stages — one of them paused.

Your columns, not ours

ManagePrint is modular on purpose. The columns aren't a workflow we think your shop should run — they're the stages your shop already runs, stored as records you can edit.

Most production software ships one pipeline and asks the shop to translate. ManagePrint asks the other way around: add a stage, rename one, pick its color, drag the columns into the order your work moves in. The board reads whatever it finds and draws that.

Below is the order board of a shop that kept six stages and renamed every one of them. Nothing was configured in code — an admin typed those names into settings, and the dot colors, the count pills, and the column order all follow. Screen printing, embroidery, DTF: apparel decorating production tracking only works if it matches the shop doing the decorating.

Two boards, one set of jobs. The order board tracks where an order sits in your pipeline, in your names. The production board above tracks what the floor has physically done to each piece, in the six workflow stages the iPad buttons advance through. The same job shows up on both, and the order's status dot rides along on its scheduler card.

Intake

1
INV-1047Unpaid

Homecoming Long Sleeves

Northgate High School

$1,842.00

Art & Proof

1
INV-1046Partial

Crew Polos — 3 locations

Halverson Plumbing

$964.50

Screens Burned

1
INV-1044Unpaid

Duty Hoodies — Station 3

Cedar Park Fire Dept.

$2,310.00

On Press

1
INV-1042Paid

Fall Spirit Pack

Northgate High School

$4,128.75

QC & Fold

1
INV-1039Paid

Taproom Staff Tees

Riverside Brewing Co.

$1,176.00

Out the Door

1
INV-1035Paid

5K Race Shirts

Lakeshore Runners Club

$2,695.00

Six columns, six status records the shop owns. Drag a card to a different column and the order's status changes.

Three of the seeded stages can't be deleted — other parts of the app key off them — but they can be renamed and recolored like any other, and nothing can be deleted while orders still sit in it. See how workflow configuration works.

How status is set

Job tracking software that records the floor, not someone's memory

A worker taps one big button on an iPad — Start Prep, End Job, Pause. That tap appends a row to the job's event log: who, what, which part, which print location, to the second. The stage moves because of the row. Nobody picks a status.

The log is append-only, so the board is never a claim about what happened — it's a read of what happened. And because the timestamps are real, the same log is what the phase analytics are computed from.

The tapThe rowThe stage
Start Prepprep_startIn Prep
End Prep & Request Approvalprep_end + approval_requestAwaiting Approval
Photos Approvedapproval_receivedApproved
Start Jobjob_startIn Production
Complete this printjob_endnext print, or Completed
Pause / Resumepause · unpauseclock stops

Prep Started

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 7:42:11 AM · Dee W.

Prep Ended

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 8:26:03 AM · Dee W.

Approval Requested

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 8:26:04 AM · Dee W.

Approval Received

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 10:14:55 AM · Ray M.

Job Started

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 10:16:20 AM · Marisol R.

Paused

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 11:02:09 AM · Marisol R.

Out of forest ink — waiting on the mix

Resumed

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 11:38:44 AM · Marisol R.

Job Completed

Part 1: Gildan 5000 Tee — Full front

8/17/2026, 12:51:02 PM · Marisol R.

One line item's log, front print. Every row on it is a tap on the floor.

Paused time is measured, then subtracted

Out of ink, waiting on a fix, gone to lunch — a worker pauses, and the pause is logged like any other event. When ManagePrint reports how long a phase took, it subtracts the time that phase spent paused.

Pause is tracked per run, not per job. If two parts of the same job are paused over the same ten minutes, that costs the job ten minutes of clock, not twenty — the intervals are unioned before they're subtracted. That's the difference between a number you can quote a customer from and one you can't.

Prep43m 52s
Approval Wait1h 48m
Production1h 58m
36m 35s paused

Production scheduling software for screen printing

The board says where work is. The scheduler says when it runs. Same jobs, same records — you're laying out the week, not maintaining a second copy of it.

Schedule

August 16 – 22, 2026
Unscheduled (2)
INV-1047 - Homecoming Long Sleeves
Northgate High School
Pending
INV-1048 - Booster Club Totes
Northgate Boosters
Pending
Sun16
16
Mon172 jobs
17
INV-1039 - Taproom Staff Tees
Riverside Brewing Co.
In Prep
INV-1046 - Crew Polos
Halverson Plumbing
Pending
Tue181 job
18
INV-1042 - Fall Spirit Pack
Northgate High School
In Production
Wed191 job
19
INV-1049 - 5K Race Shirts — Reorder
Lakeshore Runners Club
Approved
Thu201 job
20
INV-1044 - Duty Hoodies — Station 3
Cedar Park Fire Dept.
Awaiting Approval
Fri21
21
Sat22
22

A week, laid out. Unscheduled work sits in the tray until somebody drops it on a day.

Drag it onto a day

Everything unscheduled sits in a dashed tray across the top. Drag a job out of the tray onto a day and it's scheduled; drag it back and it isn't. Day, week, and month views all take the same drop.

Drag it into order

Within a day, the order you leave the cards in is the order the day runs. That order is saved per job, so what you set on Friday is still what the floor sees Monday.

Set the order status inline

Every card carries a colored dot in the corner — the order's status, in your shop's own colors. Click it and pick a different one without leaving the calendar.

Put a name on it

Assign the job to a worker straight from the card. If different print locations on the same job have different people on them, the icon changes to say so.

One job, many pieces, moving at different speeds

Real orders aren't one thing. They're four garments, three colorways, and two prints each — and they don't finish at the same time.

Per line item

Each piece has its own stage

The hoodies can be on press while the caps are still waiting on a proof. Each line item carries its own stage, its own assigned worker, and its own pause state, and the job's status is rolled up from all of them.

Per print

Front done isn't job done

A line item tracks each print location separately — the board shows 1/2, 0/3, 2/2 right on the card. Finishing one sends that part back to pick its next location rather than closing it out early.

Per press run

Four colorways, one pass

Garments priced together press together — same screens, same setup. So they advance together on one tap, and they record one event, not four. Logging it four times would inflate every average you look at later.

Finding the job you actually need

Small things, but they're the difference between a board people check and a board people ignore.

Filters that match how you ask the question

Search by job name, invoice number, or customer. Narrow to one worker, or to one stage, or to one scheduled date — there's a Today button that toggles it in a tap. Sort by scheduled date or newest first, and hide completed jobs, which is on by default.

The board tells you how many filters are on, so a quiet board is never mistaken for an empty one.

A screen on the wall, no login

Generate a Team View link and open it on the TV over the presses. It's read-only and needs no account: today's jobs, a per-worker overview, and shop status, on three tabs.

Revoke the link whenever you want and it stops working immediately. Generating a new one gives you a new address.

Common questions

What shop owners ask before they move their board off a whiteboard.

Put this week on the board.

14 days free, no credit card. Name your stages, drop a real job on a day, and watch the floor move it.